Amoveo, Modular Manufacturer – Australia & China

“In a single application we can line, waterproof and finish a wet area wall, resulting in a reassignment of two bays to improve productivity” – John, Builder-in-Charge

Project TypeGovernment Building – Refurbishment of Staff Facilities
PurposeWet area wall finish
RequirementsCompliance with Australian Building Code.
Waterproof wall lining.
Production efficiency.
Why Fibo?Proven waterproof solution in off-site construction.
Easy to install, requires fewer trades.
Cost effective and travels without any need for site based rectification works.
Fibo ProductsClient defined requirement, although Fibo is encouraged
OutcomeReduction in number of waterproofing tasks in production line.  Faster transit of modules through production.  Simple and lightning-fast fit-off.
Lower cost to produce a bathroom.
Replacing tiles with Fibo wall panels increased efficiency across the entire production line.
CommentsBeing a Chippie, I found working with Fibo very straight forward and was really impressed by the design of the locking tongue and groove. In no time it was easy to understand the benefits that wall panels offered over tiling.
For most bathroom fixings there is no need to noggin-out the frame as the panel can easily support robe hooks, towel rails, shower screen channels and toilet roll holders, reducing materials and weight.
I believe that my career has benefited by choosing to challenge the ‘way things are’ by staying one step ahead of the crowd.

Share it on